Assessment of Risks Associated with Elevated Metro Rail Projects by using Fuzzy Failure Mode a nd Effect Analysis

Received Date:17 June 2023, Accepted Date:08 September 2023, Published Date:25 October 2023

Abstract

Objective: To identify the risk factors in metro projects through literature reviews and interviews and to assess identified risks using Fuzzy FMEA. Method: An under construction elevated metro viaduct is documented, and Fuzzy FMEA is used to assess risks identified through the study. Findings: The application of Fuzzy FMEA in elevated metro construction was demonstrated and conclusions were drawn from the findings of the study. It was identified that risks under physical and economic category are high and construction risk fall between low and medium post mitigation. Novelty: This study highlights the critical aspects of risks in elevated metro projects in India; also, it provides mitigation strategies to each of the independent variable to keep the risk and time under control.

Keywords: Risk management, Risk assessment, metro rail, Elevated metro rail, FMEA, Fuzzy FMEA

References

  1. Mittal YK, Paul VK. Identification Of Critical Factors For Delay In Metro Rail Projects In India. International Journal of Students’ Research in Technology & Management. 2018;6(1):30–39. Available from: https://doi.org/10.18510/ijsrtm.2018.615
  2. Yeganeh A, Heravi MY, Razavian SB, Behzadian K, Shariatmadar H. Applying a new systematic fuzzy FMEA technique for risk management in light steel frame systems. Journal of Asian Architecture and Building Engineering. 2022;21(6):2481–2502. Available from: https://doi.org/10.1080/13467581.2021.1971994
  3. Wang Y, Zheng H, Lu X. Dynamic Risk Analysis in Metro Construction Using Statistical Process Control. Mathematical Problems in Engineering. 2020;2020:1–11. Available from: https://doi.org/10.1155/2020/4053042
  4. Selvan GM, Kathickraja DS, Dhamodharan P, Saradha P, Shanmugavadivu V. Investigation on critical issues of construction delays in Indian metro rail projects. In: AIP Conference Proceedings, RECENT TRENDS IN SCIENCE AND ENGINEERING. (Vol. 2393, Issue 1) 2022.
  5. Karmarkar OD, Krishnan SG, Delhi VSK, Velaga NRR. Risk assessment of underground and elevated metro projects from clients' and contractors' perspective. Built Environment Project and Asset Management. 2022;12(6):887–905. Available from: https://doi.org/10.1108/BEPAM-07-2021-0098
  6. Nguyen T, Tran QP, Chileshe N, Huynh TYT, Hallo L. Risk prioritization using analytic process network for metro rail implementation projects in developing countries: a typical case study of Vietnam. International Journal of Construction Management. 2022;p. 1–13. Available from: https://doi.org/10.1080/15623599.2022.2117442
  7. Alizadeh SS, Solimanzadeh Y, Mousavi S, Safari GH. Risk assessment of physical unit operations of wastewater treatment plant using fuzzy FMEA method: a case study in the northwest of Iran. Environmental Monitoring and Assessment. 2022;194(9). Available from: https://doi.org/10.1007/s10661-022-10248-9
  8. Testik OM, Unlu ET. Fuzzy FMEA in risk assessment for test and calibration laboratories. Quality and Reliability Engineering International. 2023;39(2):575–589. Available from: https://doi.org/10.1002/qre.3198
  9. Jin G, Meng Q, Feng W. Optimization of Logistics System with Fuzzy FMEA-AHP Methodology. Processes. 2022;10(10):1–14. Available from: https://doi.org/10.3390/pr10101973

Copyright

© 2023 Amrutha & Kranti Kumar. This is an open-access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited. Published By Indian Society for Education and Environment (iSee)

DON'T MISS OUT!

Subscribe now for latest articles and news.